Five-Years Ago (21-January-2007) — Norway

Gone to See Norway 2007 Family Vacation. Day 2: Oslo.

This was the beginning of the extended family winter vacation in Norway. Our first full day was in Oslo. Some of the children in the group had never seen snow before. A long day with many things to see and do as well as adjust to the time difference.

Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
National Theater and Ibsen. Winter in Oslo Norway (David J Mathre)
National Theater and Ibsen. Winter in Oslo Norway (David J Mathre)
National Theater and Ibsen. Winter in Oslo Norway (David J Mathre)
National Theater and Ibsen. Winter in Oslo Norway (David J Mathre)
Nobel Peace Center. Winter in Oslo Norway (David J Mathre)
Nobel Peace Center. Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Winter in Oslo Norway (David J Mathre)
Artillery Guarding Oslo at the Akeshus Fortress. Winter in Oslo Norway. (David J Mathre)
Artillery Guarding Oslo at the Akeshus Fortress. Winter in Oslo Norway. (David J Mathre)
Roald Amundsen. Arctic Museum, Winter in Oslo Norway (David J Mathre)
Roald Amundsen. Arctic Museum, Winter in Oslo Norway (David J Mathre)
Roald Amundsen. Arctic Museum, Winter in Oslo Norway (David J Mathre)
Roald Amundsen. Arctic Museum, Winter in Oslo Norway (David J Mathre)
Family in Norway, Winter in Oslo Norway (David J Mathre)
Family in Norway, Winter in Oslo Norway (David J Mathre)
Glass Menagerie, National Theater, Winter in Oslo Norway (David J Mathre)
Glass Menagerie, National Theater, Winter in Oslo Norway (David J Mathre)
Orchids, Winter in Oslo Norway (David J Mathre)
Orchids, Winter in Oslo Norway (David J Mathre)

Wednesday (02-November-2011) — New Jersey

Late October Nor’easter Aftermath: Day 4

Update from PSE&G >95% of Power Restored. Restoration Challenges:

  • This storm caused more individual incidents of damage to PSE&G’s electric infrastructure than Hurricane Irene.
  • This storm was particularly damaging because, with leaves still on the
    trees, the heavy snow created considerable weight on tree limbs, bringing down
    numerous trees and power lines.
  • In addition to major circuits, there were a larger number of individual
    service lines from our poles to customers’ homes and business that were
    damaged.

Tuesday (01-November-2011) — New Jersey

Late October Nor’easter Aftermath: Day 3

Other than a few power dips (brown outs), the power remained on for the last day. My APC UPS units continue to protect the computers and servers. The following is an update from PSE&G.

  • 88% of the more than 570,000 PSE&G customers impacted by power outages from
    Saturday’s wet, heavy snow that brought down numerous trees and power lines.
    Crews will continue to work around the clock until all customers have power.
  • PSE&G expects to meet the state’s goal of having at least 95 percent
    of customers restored by Thursday. At this time, about 67,000 customers are
    without power with the majority of these in Bergen, Essex and Passaic
    counties
  • This storm caused more individual incidents of damage to
    PSE&G’s electric infrastructure than did Hurricane Irene. There is a larger
    number of service lines that are damaged as a result of falling tree limbs.
    Repairing the significant number of single lines from the poles to customers’
    homes and businesses presents the greatest challenge with this
    storm.
  • PSE&G is using every available resource to make repairs and
    restore electricity as quickly and safely as possible.  Resources include 262
    crews and troubleshooters, 116 line contractor crews and 240 tree crews working
    to restore power.  In addition to its own crews, PSE&G is receiving
    assistance from mutual aid crews from Alabama, Florida, Georgia and
    Mississippi.
  • Electric crews work to restore power to the largest numbers
    of customers first, taking into account “priority” customers, such as hospitals,
    police stations, fire stations, water and sewer facilities, schools, and
    communications facilities (TV, radio, and telephone).  At the same time, the
    utility restores power to homes and businesses, starting with the circuits
    serving the largest number of customers.

31-October-2011

Halloween and a 2 Year Anniversary.

I finally got power back here at my house in New Jersey after a very early snowstorm. Two years ago today I was in Florida for a wedding of Lars (my brother) and Valerie. I’ve made it clear in the past that I do not do, and am not a wedding photographer. On the other hand this did not stop me from taking some pictures that day. For a full selection of images from that day please check out 31-October-2009.

Lars and Valerie. (David J Mathre)
Lars and Valerie. (David J Mathre)

29-October-2011

Winter is Here!

Yesterday’s forcast that the Northeaster would switch from rain to snow after midnight Saturday was wrong. It started snowing here a little after 8 AM. The trees still have leaves, and I have seen many branches coming down. The power has been going on and off — and is now off. Running on battery backup right now — will probably end up moving into the RV until power is restored. Images to follow.

Last Green Tomato -- Early Snow in New Jersey. Image taken with a Nikon D300 and 60 mm f/2.8 macro. (David J Mathre)
Last Green Tomato -- Early Snow in New Jersey. Image taken with a Nikon D300 and 60 mm f/2.8 macro. (David J Mathre)

 

Day 12 and Counting

My Drobo disk-array is rebuilding after adding a new drive. Don’t know how long it will take. New images to follow. The down side to large storage solutions such as Drobo is the time required for backup and restore. Not sure how many days this will take!!!!